Asbestos Removal in Bothell

At Bothell Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Empty room with a sealed containment partition and portable air-filtration equipment
Asbestos popcorn ceiling removalAsbestos floor tile and mastic removalAsbestos insulation removalAsbestos siding and roofing removalAsbestos abatement before renovation and demolitionCommercial asbestos abatement

Residential asbestos removal services

Textured popcorn ceiling in a 1970s living room sealed off with plastic sheeting for abatementNine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Asbestos popcorn ceiling removal

We look at the painted texture, patching compound and old repairs before ceiling work starts, because any of them can change what has to come off. The survey sets the removal area. Repairs, the new finish and a paint-ready surface come after removal, as a separate job.

Asbestos floor tile and mastic removal

One room can hold tile, sheet-flooring backing and glue, and each may be a different material, so we test every layer that is coming up. Before work begins, we ask you and your flooring installer who will repair and prepare the subfloor afterwards.

Insulated heating pipes in a basement mechanical areaIntact gray cement-shingle siding on the exterior of a house

Asbestos insulation removal

Pipe and boiler insulation is a different job from loose attic fill. Please leave anything suspect alone. We look at where it is, its condition and what your work will disturb, and testing shows what needs specialist handling, from access and the heating shutdown to the insulation that goes back.

Asbestos siding and roofing removal

Cement siding and roofing get tested before they are replaced or demolished. The removal is planned alongside your siding or roofing job, especially where an opening will be cut or an older layer exposed, and the plan covers access, handling and weather protection for the bare wall.

Older wood-sided house behind a chain-link fence, prepared for demolition, with a plastic-lined dumpster, wet gravel and fir trees under an overcast sky

Asbestos abatement before renovation and demolition

We survey the rooms a remodel will change, or the whole building for a demolition, and we want the plans before any wall is cut open. The test results then drive any agency notice and the order of removal. We also name the point where your remodeler or demolition contractor takes over.

Commercial asbestos removal projects

Empty commercial room with floor tiles and a containment partition

Commercial asbestos abatement

Tenants next door may stay in place, and the air system may be shared. Whether it is a tenant improvement, a shared building or a commercial tear-down, we map the suites and access routes involved, fit the survey and the work order to how the building is used, and give the owner, tenants and next trades the records they need.

Asbestos testing and removal costs

More than 2 in every 10 Bothell homes were built before 1980, so asbestos still turns up in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Bothell, Kenmore and Brier. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos survey and removal before a remodel or tear-down

  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Abatement for one kitchen or bathroom remodel$2,000 – $6,000+
  • Asbestos survey before tearing down a house$800 – $2,000+
  • Abatement of a whole house before tear-down$10,000 – $30,000+
What is included

An inspector samples every material the remodel or demolition will disturb, the lab reports on each one, and only what tests positive is removed, bagged and hauled away. A house that will be torn down always needs a survey and a notice to Puget Sound Clean Air Agency. Your carpenter, remodeler or wrecking crew bills for their own part.

Get a free quoteSee an example projectAbout this service

Asbestos popcorn ceiling removal

  • One room ceiling, about 150 to 250 sq ft$1,800 – $4,500+
  • Several rooms or one floor, about 600 to 1,000 sq ft$5,500 – $14,000+
  • Whole house, about 1,500 to 2,000 sq ft of ceiling$10,000 – $25,000+
What is included

A sample of the texture to the lab, the room wrapped in plastic, the texture soaked and scraped into sealed bags, then disposal and a wet clean. Bothell ceilings over 48 sq ft get a clean air agency notice before day one. Scaffold for tall ceilings is in the price; new texture and paint are not.

Get a free quoteSee an example projectAbout this service

Asbestos floor tile and mastic removal

  • One bathroom or laundry floor, about 50 to 100 sq ft$1,200 – $3,000+
  • One kitchen or large room, about 150 to 300 sq ft$1,800 – $5,000+
  • Several rooms, about 500 to 1,000 sq ft$4,000 – $12,000+
What is included

Separate lab tests of the flooring and the adhesive, plastic at the doors, the tile lifted whole and the adhesive scraped off wet, then bagging, disposal and a clean subfloor. Tile that lifts in one piece, with its glue, skips the agency paperwork. The floor that goes down next is a separate cost.

Get a free quoteSee an example projectAbout this service

Asbestos insulation removal

  • Pipe insulation in a basement, about 50 to 150 ft of pipe$1,500 – $4,500+
  • Old boiler or furnace with its insulation and nearby pipe$4,500 – $12,000+
  • Attic vermiculite or loose-fill, about 800 to 1,500 sq ft of attic$8,000 – $20,000+
What is included

A sealed work area kept under negative air, the attic fill, pipe wrap or furnace covering removed wet or by HEPA vacuum, sealed bags, disposal and an air test at the end. An attic floor of vermiculite is counted in square feet, and a whole floor is well past the 48 sq ft mark, so its notice is filed first. Fresh insulation is added by others.

Get a free quoteSee an example projectAbout this service

Asbestos siding removal

  • Siding on one wall, garage or shed, about 200 to 400 sq ft$2,500 – $6,500+
  • Siding on a one-story house, about 1,200 to 1,800 sq ft of wall$10,000 – $25,000+
  • Siding on a two-story house, about 2,000 to 3,000 sq ft of wall$16,000 – $40,000+
What is included

Cement shingles or panels wetted, taken off whole by pulling the nails, wrapped and hauled away, with plastic on the ground and a final pick-up of the beds. Cement siding counts as friable here, so the paperwork goes in before the ladders go up. Re-siding is extra. If the roof is cement too, someone climbs up to look before it gets a price.

Get a free quoteSee an example projectAbout this service

Commercial asbestos abatement

  • Survey of a small commercial or apartment building$1,500 – $4,000+
  • Small office or shop area, about 500 to 1,000 sq ft$5,000 – $15,000+
  • Larger floor or building section, about 2,500 sq ft$12,000 – $35,000+
What is included

For shops, offices and apartment buildings: the inspector’s survey, a closed-off work area, removal, disposal and an air test before the tenant gets the keys. Outside of houses, the notice and its fee depend on how much material comes out. We walk the space before we put a number on it.

Get a free quoteSee an example projectAbout this service

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Test the materials first

We test what your project will disturb and share the findings with every trade that may disturb those materials.

02

Plan the removal

Before the next trades are scheduled, we set the work area, access, any agency notice and the disposal plan.

03

Hand the space back

We hand over the paperwork, say when the room can be used again, and work with the next contractor on repairs and finishes.

One survey for every trade on the job

Whoever plans the demolition, electrical, plumbing or finish work needs the same survey in hand. If the design changes to open another wall or replace more flooring, call us first and we will check whether the survey covered that area. A report on one room is not permission to disturb the rest of the house.

Survey and project requirements in Washington

Puget Sound Clean Air Agency has one set of guidance for remodels and another for demolitions, and we confirm what that means for your property and your job: the survey, any notices and the disposal. A building permit does not take the place of the asbestos survey.

Asbestos removal in Bothell and nearby communities

We also serve Kenmore and Brier. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can a photograph confirm asbestos?

No. You cannot tell by looking. Suspect material that is damaged, or that a remodel will disturb, should be sampled by a professional, and a lab analyzes the sample.

Does every asbestos-containing material need removal?

Not necessarily. Condition and planned disturbance matter. We look at the material and tell you whether it can stay where it is or needs something done.

Does removal include new flooring or ceiling finishes?

Only if they are part of the job we agree on. We also find out up front who repairs the remaining surface and who installs the new finish.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (425) 738-3615

Call (425) 738-3615